Randomness Guide to London - Differences between Version 7 and Version 2 of Battersea Power Station Station
Version 7 | Version 2 |
---|---|
== Line 2 == | |
Accessibility: According to an email from TfL (20 Sep 2021), there is step-free access from street to train. See also [https://twitter.com/AlansTweets/status/1439963041244852225 Alan Benson's illustrated Twitter thread] with details of testing the access as a wheelchair user. |
|
== Line 5 == | |
* [https://diamondgeezer.blogspot.com/2021/09/battersea-power-station-station.html diamond geezer article] |
|
== Line 8 == | == Line 5 == |
category='Northern Line,Step-Free Access,Tube,Tube Termini,Zone 1 Stations' |
category='Northern Line,Tube,Tube Termini,Zone 1 Stations' |
== Line 12 == | == Line 9 == |
host='2a00:1098:86:4d:c0ff:ee:15:900d' |
host='2001:8b0:ca94:869f:c595:7a23:fa4a:52b0' |
== Line 14 == | == Line 11 == |
latitude='51.479708' |
latitude='51.479099' |
== Line 16 == | == Line 13 == |
longitude='-0.142198' |
longitude='-0.140697' |
== Line 18 == | == Line 15 == |
map_link='http://streetmap.co.uk/map?x=529106&y=177275' |
map_link='http://streetmap.co.uk/map?x=529212&y=177210' |
== Line 20 == | == Line 17 == |
os_x='529106' os_y='177275' |
os_x='529212' os_y='177210' |
Zone 1 Tube station on the Charing Cross branch of the Northern Line, and also one of its termini. It opened on 20 September 2021.
See also:
List all versions