Randomness Guide to London - Differences between Version 7 and Version 6 of Blackfriars Station

Version 7 Version 6
== Line 2 ==
Major works are taking place to the station as part of the Thameslink Upgrade programme. The railway station will not close except for a period of four weeks over summer 2010, though the Tube station will be closed for rebuilding from March 2009 until 2011. <small>[http://www.thameslinkprogramme.co.uk/cms/pages/view/40 Source]</small>

== Line 10 == == Line 8 ==
edit_type='Minor tidying'
edit_type='Normal edit'
== Line 13 == == Line 11 ==
host='161.74.11.26'
host='213.165.225.132'
== Line 18 == == Line 16 ==
major_change='0'
major_change='1'
== Line 29 == == Line 27 ==
summary='Zone 1 Tube and rail station on the Circle and District lines, and the Thameslink network.' website='' summary='Zone 1 Tube and rail station on the Circle and District lines, and the Thameslink network.'
summary='Zone 1 Tube and rail station on the Circle and District lines, and the Thameslink network.'
website=''

Zone 1 Tube and rail station on the Circle and District lines. It's the next station south from City Thameslink on the Thameslink lines; the line splits south of here to go via either Elephant & Castle on a little tour of south London taking in Sutton and Wimbledon, or London Bridge to East Croydon, Gatwick, and eventually Brighton.

See also:


List all versions