Randomness Guide to London - Differences between Version 18 and Version 11 of Blackfriars Station
| Version 18 | Version 11 |
|---|---|
| == Line 0 == | == Line 0 == |
| Zone 1 Tube station on the [[Category Circle Line|Circle]] and [[Category District Line|District]] lines. |
Zone 1 rail station on the Circle and District lines. It's the next station south from [[City Thameslink Station|City Thameslink]] on the [[Category Thameslink|Thameslink]] lines; the line splits south of here to go via either [[Elephant And Castle Station|Elephant & Castle]] on a little tour of south London taking in [[Sutton Station|Sutton]] and [[Wimbledon Station|Wimbledon]], or [[London Bridge Station|London Bridge]] to [[East Croydon Station|East Croydon]], Gatwick, and eventually Brighton. |
| == Line 2 == | == Line 2 == |
|
It's also a rail station, and the next station south from [[City Thameslink Station|City Thameslink]] on the [[Category Thameslink|Thameslink]] lines; the line splits south of here to go via either [[Elephant And Castle Station|Elephant & Castle]] on a little tour of south London taking in [[Sutton Station|Sutton]] and [[Wimbledon Station|Wimbledon]], or [[London Bridge Station|London Bridge]] to [[East Croydon Station|East Croydon]], Gatwick, and eventually Brighton. |
It's also a Tube station, but due to major works (part of the Thameslink Upgrade programme), the Tube part is closed until late February 2012. |
| == Line 4 == | == Line 4 == |
|
The station now has two entrances, one on each side of the Thames. The southern entrance [http://www.london-se1.co.uk/news/view/5705 opened] in December 2011 <small>[http://www.flickr.com/photos/55935853@N00/6548395757/ photo]</small>. The main station building on the north side of Blackfriars Bridge was opened in early 2012 replacing the earlier entrance <small>[http://www.flickr.com/photos/55935853@N00/400632638/ photo]</small>. |
The station now has two entrances, one on each side of the Thames. The southern entrance [http://www.london-se1.co.uk/news/view/5705 opened] in December 2011. |
| == Line 10 == | |
|
* [http://www.ianvisits.co.uk/blog/2012/02/20/photos-blackfriars-tube-station-reopens/ Ian Visits article] * [http://diamondgeezer.blogspot.com/2012/02/blackfriars-redux.html diamond geezer article] * [http://150greatthingsabouttheunderground.com/2012/04/19/14-the-north-entrance-to-blackfriars/ 150 Great Things post on the north entrance to Blackfriars] |
|
| == Line 14 == | == Line 11 == |
|
category='Circle Line,District Line,Rail,Thameslink,Trains To East Croydon,Trains To King's Cross/St Pancras,Trains To London Bridge,Tube,Zone 1 Stations' edit_type='Minor tidying' |
category='Rail,Thameslink,Zone 1 Stations' edit_type='Normal edit' |
| == Line 18 == | == Line 15 == |
|
host='2a00:1098:86:4d:c0ff:ee:15:900d' |
host='81.187.166.218' |
| == Line 20 == | == Line 17 == |
|
latitude='51.511617' |
latitude='51.511105' |
| == Line 22 == | == Line 19 == |
|
longitude='-0.103084' major_change='0' |
longitude='-0.101500' major_change='1' |
| == Line 25 == | == Line 22 == |
|
node_image='https://farm8.staticflickr.com/7078/7266993330_d5f87bed44_m.jpg' |
node_image='https://farm1.static.flickr.com/160/400632638_8dd286b6d2_m_d.jpg' |
| == Line 27 == | == Line 24 == |
|
node_image_licence='https://creativecommons.org/licenses/by-sa/2.0/' node_image_url='https://www.flickr.com/photos/55935853@N00/7266993330/' |
node_image_licence='https://creativecommons.org/licenses/by-nc-nd/2.0/' node_image_url='https://www.flickr.com/photos/55935853@N00/400632638/' |
| == Line 31 == | == Line 31 == |
| summary='Zone 1 rail station on the Circle and District lines, and the Thameslink network. Usually also a Tube station, but that part's currently closed (until late 2011).' summary='Zone 1 Tube and rail station on the Circle and District lines, and the Thameslink network.' | summary='Zone 1 rail station on the Circle and District lines, and the Thameslink network. Usually also a Tube station, but that part's currently closed (until late 2011).' summary='Zone 1 Tube and rail station on the Circle and District lines, and the Thameslink network.' |
Zone 1 rail station on the Circle and District lines. It's the next station south from City Thameslink on the Thameslink lines; the line splits south of here to go via either Elephant & Castle on a little tour of south London taking in Sutton and Wimbledon, or London Bridge to East Croydon, Gatwick, and eventually Brighton.
It's also a Tube station, but due to major works (part of the Thameslink Upgrade programme), the Tube part is closed until late February 2012.
The station now has two entrances, one on each side of the Thames. The southern entrance opened in December 2011.
See also:
List all versions