Randomness Guide to London - Differences between Version 18 and Version 10 of Bank And Monument Stations

Version 18 Version 10
== Line 0 == == Line 0 ==
Enormous station complex made up of two stations (Bank and Monument), comprising five Tube lines plus a [[Category DLR|DLR]] terminus. There are ten platforms, of which the DLR are 9 (departures) and 10 (arrivals).
Enormous station complex made up of Bank and Monument stations. Five Tube lines plus a [[Category DLR|DLR]] terminus. Ten platforms, of which the DLR are 9 (departures) and 10 (arrivals).
== Line 2 == == Line 2 ==
Note that Monument station is technically in [[Locale EC4|EC4]], with an address on King William Street (EC4R 9AA).
As of 31 March 2008, interchange is drastically restricted due to escalator work.
== Line 4 ==
The original idea was for the complex to basically operate as three separate stations:
* [[Category Central Line|Central Line]] and [[Category Waterloo And City Line|Waterloo and City Line]]
* [[Category Northern Line|Northern Line]] and [[Category DLR|DLR]]
* [[Category Circle Line|Circle]] and [[Category District Line|District]] lines

Interchange between these three sections of the complex was planned to be only via street level. It's <i>likely</i> though not yet tested that street-level interchange will count as a continuous journey for Oyster PAYG purposes. For more information, see [http://www.tfl.gov.uk/corporate/media/newscentre/7763.aspx TfL announcement], [http://london-underground.blogspot.com/2008/03/no-interchange-at-bank-and-monument.html Going Underground blog post] (including the comments), and [http://londonconnections.blogspot.com/2008/03/how-bank-monument-falls-apart.html London Connections diagrams].

Things are still changing, but [http://londonconnections.blogspot.com/2008/04/bank-monument-open.html this London Connections diagram] shows the (somewhat improved) situation as of 4 April.

== Line 5 ==
* [http://150greatthingsabouttheunderground.com/2013/01/13/77-the-travelator-at-bank/ 150 Great Things article on the Bank travelator]
== Line 8 ==
* [http://www.qype.co.uk/place/81329 Qype comments]
== Line 12 == == Line 19 ==
edit_type='Minor tidying'
edit_type='Normal edit'
== Line 15 == == Line 22 ==
host='2a00:1098:86:4d:c0ff:ee:15:900d'
host='213.165.225.132'
== Line 17 == == Line 24 ==
latitude='51.513247'
locale='City,EC2,EC3,EC4,Monument'
longitude='-0.088820'
major_change='0'
latitude='51.512735'
locale='City,EC2,EC3,EC4'
longitude='-0.087235'
major_change='1'
== Line 22 ==
node_image='https://farm4.static.flickr.com/3271/3025715000_69e04e414a_m.jpg'
node_image_copyright='Ewan-M'
node_image_licence='https://creativecommons.org/licenses/by-sa/2.0/deed.en_GB'
node_image_url='https://www.flickr.com/photos/55935853@N00/3025715000/'

Enormous station complex made up of Bank and Monument stations. Five Tube lines plus a DLR terminus. Ten platforms, of which the DLR are 9 (departures) and 10 (arrivals).

As of 31 March 2008, interchange is drastically restricted due to escalator work.

The original idea was for the complex to basically operate as three separate stations:

Interchange between these three sections of the complex was planned to be only via street level. It's likely though not yet tested that street-level interchange will count as a continuous journey for Oyster PAYG purposes. For more information, see TfL announcement, Going Underground blog post (including the comments), and London Connections diagrams.

Things are still changing, but this London Connections diagram shows the (somewhat improved) situation as of 4 April.

See also:


List all versions