Randomness Guide to London - Differences between Version 10 and Version 9 of Blackfriars Station

Version 10 Version 9
== Line 2 == == Line 2 ==
It's also a Tube station, but due to major works (part of the Thameslink Upgrade programme), the Tube part is closed until late 2011.
<b>Note:</b> Due to the upgrade works mentioned below, the railway part of Blackfriars Station is [http://www.thameslinkprogramme.co.uk/cms/pages/view/60 closed until 17 January 2011].
== Line 4 ==
It's also a Tube station, but due to major works (part of the Thameslink Upgrade programme), the Tube part is closed until 2011.

== Line 9 == == Line 11 ==
category='Rail,Thameslink,Zone 1 Stations'
edit_type='Minor tidying'
category='Rail,Temporarily Closed,Thameslink,Zone 1 Stations'
edit_type='Normal edit'
== Line 18 == == Line 20 ==
major_change='0'
major_change='1'
== Line 31 == == Line 31 ==
summary='Zone 1 rail station on the Circle and District lines, and the Thameslink network. Usually also a Tube station, but that part's currently closed (until 2011).' summary='Zone 1 rail station on the Circle and District lines, and the Thameslink network. Usually also a Tube station, but that part's currently closed (until late 2011).' summary='Zone 1 rail station on the Circle and District lines, and the Thameslink network. Usually also a Tube station, but that part's currently closed (until 2011).' summary='Zone 1 rail station on the Circle and District lines, and the Thameslink network. Usually also a Tube station, but that part's currently closed (until late 2011).'

Zone 1 rail station on the Circle and District lines. It's the next station south from City Thameslink on the Thameslink lines; the line splits south of here to go via either Elephant & Castle on a little tour of south London taking in Sutton and Wimbledon, or London Bridge to East Croydon, Gatwick, and eventually Brighton.

Note: Due to the upgrade works mentioned below, the railway part of Blackfriars Station is closed until 17 January 2011.

It's also a Tube station, but due to major works (part of the Thameslink Upgrade programme), the Tube part is closed until 2011.

See also:


List all versions